indura-logo

Energy efficiency design for Indura

Im3 conducts an energy efficiency study for Indura, Chile

Indura – Planta Lirquen, the leading firm in industrial gas and welding, asked for advice on identifying some undesired electrical phenomena that had arisen at this plant.

 

Working together with the power supplier, CGE (Compañía General de Electricidad), im3 managed to conduct a synchronised, simultaneous study from the distribution company’s substation to the INDURA substations.

Using applied technology and on the basis of the studies conducted, it was possible to identify the problems. Differentiating between internal and external issues, giving appraisals of energy supply and use, in terms of meeting the minimums the supplier must assure and the conditions in which the customer must receive the power.