Development of reinforced concrete foundation for Power Transformer

13/01/2022

From Sistem-Im3 Colombia we strive to develop the best engineering supported by the latest generation BIM tools.

In this case I present the development of a foundation for a power transformer of an Electrical Substation design.

We continue to deepen the scope and possibilities that the new construction 4.0 offers us.

Att. Architect Eduardo Perozo, BIM leader of the Sistem-Im3 consortium.