27 Sep MT/BT Project Design and Engineering
27/09/2021
The consortium of which IM3 DO BRASIL is part was awarded on the last 07/16/2021 in the Tender for MT/BT Project Preparation Services – Lote Sul – Enel Ceará.
This new contract is fundamental for Im3’s growth in the Brazilian territory and reinforces the already consolidated partnership with the ENEL group.
This is a frame contract of 36 months that is intended to increase Im3’s presence in the northeast region of Brazil.
The base for the service will be established in Juazeiro do Norte.