Last News

  • Noticia

  • Categoría

  • Año

  • News

  • Year

01/03/2022As the evolution of society and the way of life has been changing, it has been necessary to face new uses of public space, giving more importance to the pedestrian,...

01/02/2022Ingenieros Emetres, in recent years has participated and developed several project designs and/or Construction Management related to the sustainable development of cities, among which the following stand out:·         Plan for...

25/01/2022The work team of Ingenieros Emetres, S.L.P., in its Urban Engineering division, strengthens the provision of services to different municipalities in the Community of Madrid in Spain, with the recent...

24/01/2022On Wednesday, January 19, two of the three main telecommunications operators in the United States (AT&T and Verizon) postponed the activation of 5G services near some airports, after the airlines...

21/01/22To protect the integrity of communication cards in fiber optic links and guarantee the durability of telecommunications assets, it is necessary to perform a system attenuation calculation report.Im3's Control, Protection...

20/01/2022Next Wednesday, January 26, our colleague @Fernando del pozo will be participating in Green Pavements, an event on sustainability and street paving, organized jointly by @BAC Engineering Consultancy Group, @Ingenieros...

17/01/2022In December, Im3 signed an exclusivity contract with the Polish manufacturer Bitstream for the commercialization of state-of-the-art switch solutions for digital networks and satellite clocks in Chile.The agreement includes the...

14/01/2022According to definition 2. of Google's Oxford Languages dictionary, logic is: Method or reasoning in which ideas or the succession of facts are manifested or developed in a coherent way...

10/01/2022Im3 3D vector design: Sebastián Tabares R.In 1820, 202 years ago, during the Industrial Revolution, the English chemist William Farish devised a new system of representation for drawing machine elements...

15/12/2021Within the framework of the European Forum of Digital Energy (FEDE 4.0), sessions were held on November 22, 23 and 24:• Nov. 22 Introduction to synchronization.• Nov. 23 The round...

13/12/2021After a few frantic weeks of preparations at last, on the recent Monday, December 6th , the office that will be the main headquarters of IM3 in the city of...

02/12/2021The consortium BAC-IM3 directs and coordinates as owner engineer the paving works that have been carried out in Torrent de l’Olla street in Barcelona (Spain) with a new sustainable pavement...

23/11/2021With the aim of giving the best response to our clients, IM3 has inaugurated a new branch office in the city of Huelva, Andalusia, Spain.The office is equipped with 23...